Application of The Connecticut Company for Approvalof Method of Reconstruction of Tracks in the City of Norwalk, on main street from wall street to New Canaan Avenue: on Wall Street from a point near Isaac Street to Knight Street, and Construction of Second Track on Main Street from Hoyt Street to Henry Street
- Status
- Closed May 29, 1912
- Filings
- None listed
- Documents
- On the current system (documents are copied for 2024 and later dockets)
This docket's record on the current system (opens in a new tab)
Filings
This historical docket holds a single summary record from the pre-electronic archive. There are no separate filings.