Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Docket 14-00-00HIST01161Historical record

Report of Chief Engineer and Inspector of his examination into the causes of and circumstances connected with the 27th day of February, 1914, In the operation of the Plant or equipment of the Connecticut Company, resulting in injury to Mrs. W.B. Grippin and Mrs. Dennison

Closed March 26, 1914

A single summary record from the pre-electronic archive.

The record

This docket comes from the Authority's pre-electronic archive. The current system keeps one summary record for it: the title, the status and the date it closed. There are no separate filings or documents to list.

Title as recorded

Report of Chief Engineer and Inspector of his examination into the causes of and circumstances connected with the 27th day of February, 1914, In the operation of the Plant or equipment of the Connecticut Company, resulting in injury to Mrs. W.B. Grippin and Mrs. Dennison

About this docket

Docket number
14-00-00HIST01161
Status
Closed March 26, 1914
Public filings
None listed
Documents
On the current system