Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Docket 19-00-00HIST03016Historical record

Report of the Chief Engineer of His Examination Into the Causes of and Circumstances Connected With the Accident Occurring Lakewood JCT., Waterbury on the 7th Day of January, 1919, in the Operation of the Plant or Equipment of The Connecticut Company, r

Closed January 27, 1919

A single summary record from the pre-electronic archive.

The record

This docket comes from the Authority's pre-electronic archive. The current system keeps one summary record for it: the title, the status and the date it closed. There are no separate filings or documents to list.

Title as recorded

Report of the Chief Engineer of His Examination Into the Causes of and Circumstances Connected With the Accident Occurring Lakewood JCT., Waterbury on the 7th Day of January, 1919, in the Operation of the Plant or Equipment of The Connecticut Company, r

About this docket

Docket number
19-00-00HIST03016
Status
Closed January 27, 1919
Public filings
None listed
Documents
On the current system