In the Matter of Petition of the Eastern Connecticut Company for Approval of Proposed Method of Construction of a 33,000 Volt Transmission Line 60 Cycles from White Rock Substation of Petitioner in the Town of Stonington to the Rhode Island State Line in Pawcatuck; Also for Approval in Change in Construction of Existing 16,200 Volt Line, 25 Cycles from Said White Roock Substation to Hallville Power Station in the Town of Preston
Title as recorded
IN THE MATTER OF PETITION OF THE EASTERN CONNECTICUT COMPANY FOR APPROVAL OF PROPOSED METHOD OF CONSTRUCTION OF A 33,000 VOLT TRANSMISSION LINE 60 CYCLES FROM WHITE ROCK SUBSTATION OF PETITIONER IN THE TOWN OF STONINGTON TO THE RHODE ISLAND STATE LINE IN PAWCATUCK; ALSO FOR APPROVAL IN CHANGE IN CONSTRUCTION OF EXISTING 16,200 VOLT LINE, 25 CYCLES FROM SAID WHITE ROOCK SUBSTATION TO HALLVILLE POWER STATION IN THE TOWN OF PRESTON
- Status
- Closed June 2, 2005
- Filings
- None listed
- Documents
- On the current system (documents are copied for 2024 and later dockets)
This docket's record on the current system (opens in a new tab)
Filings
This historical docket holds a single summary record from the pre-electronic archive. There are no separate filings.