Docket 22-00-00HIST03977ClosedDecember 29, 1922Historical record

Report of the Chief Engineer of His Examination into the Causes of and Circumstances Connected with the Accident Occurring at Stamford (Glenbrook) on the 26th Day of December, 1922, in the Operation of the Plant or Equipment of The Connecticut Company, Resulting in the Death of James Healy

Title as recorded

REPORT OF THE CHIEF ENGINEER OF HIS EXAMINATION INTO THE CAUSES OF AND CIRCUMSTANCES CONNECTED WITH THE ACCIDENT OCCURRING AT STAMFORD (GLENBROOK) ON THE 26TH DAY OF DECEMBER, 1922, IN THE OPERATION OF THE PLANT OR EQUIPMENT OF THE CONNECTICUT COMPANY, RESULTING IN THE DEATH OF JAMES HEALY

Status
Closed December 29, 1922
Filings
None listed
Documents
On the current system (documents are copied for 2024 and later dockets)

This docket's record on the current system (opens in a new tab)

Filings

This historical docket holds a single summary record from the pre-electronic archive. There are no separate filings.