Report of the Engineers of the Public Utilities Commission of Connecticut Relative to the Advisability of Generating or Purchasing Electricity for Lighting and Power Facilities at the Fairfield State Hospital, Newtown, Connecticut
Title as recorded
REPORT OF THE ENGINEERS OF THE PUBLIC UTILITIES COMMISSION OF CONNECTICUT RELATIVE TO THE ADVISABILITY OF GENERATING OR PURCHASING ELECTRICITY FOR LIGHTING AND POWER FACILITIES AT THE FAIRFIELD STATE HOSPITAL, NEWTOWN, CONNECTICUT
- Status
- Closed January 4, 2006
- Filings
- None listed
- Documents
- On the current system (documents are copied for 2024 and later dockets)
This docket's record on the current system (opens in a new tab)
Filings
This historical docket holds a single summary record from the pre-electronic archive. There are no separate filings.