Report of the Assistant Electrical Engineer of His Examination into the Causes of and Circumstances Connected with the Interruption of Service Occurring at New Britain on the 15th Day of June, 1932, in the Operation of the Plant or Equioment of the Connecticut Light and Power Company.
Title as recorded
REPORT OF THE ASSISTANT ELECTRICAL ENGINEER OF HIS EXAMINATION INTO THE CAUSES OF AND CIRCUMSTANCES CONNECTED WITH THE INTERRUPTION OF SERVICE OCCURRING AT NEW BRITAIN ON THE 15TH DAY OF JUNE, 1932, IN THE OPERATION OF THE PLANT OR EQUIOMENT OF THE CONNECTICUT LIGHT AND POWER COMPANY.
- Status
- Closed December 30, 2005
- Filings
- None listed
- Documents
- On the current system (documents are copied for 2024 and later dockets)
This docket's record on the current system (opens in a new tab)
Filings
This historical docket holds a single summary record from the pre-electronic archive. There are no separate filings.