Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Docket 45-00-00HIST07701Historical record

Report of the Engineering Division of the Examination into the Causes of and Circumstances Connecticed with the Accident Occurring at Windsor Locks on the 31st Day of August, 1945, in the Operation of the Plant or Equipment of The Connecticut Light and Power Company, Resulting in the Death of Ensign Richard H. Disesa

Closed September 28, 1945

A single summary record from the pre-electronic archive.

The record

This docket comes from the Authority's pre-electronic archive. The current system keeps one summary record for it: the title, the status and the date it closed. There are no separate filings or documents to list.

Title as recorded

REPORT OF THE ENGINEERING DIVISION OF THE EXAMINATION INTO THE CAUSES OF AND CIRCUMSTANCES CONNECTICED WITH THE ACCIDENT OCCURRING AT WINDSOR LOCKS ON THE 31ST DAY OF AUGUST, 1945, IN THE OPERATION OF THE PLANT OR EQUIPMENT OF THE CONNECTICUT LIGHT AND POWER COMPANY, RESULTING IN THE DEATH OF ENSIGN RICHARD H. DISESA

About this docket

Docket number
45-00-00HIST07701
Status
Closed September 28, 1945
Public filings
None listed
Documents
On the current system