Report of the Engineering Division of the Examination into the Causes of and Circumstances Connected with the Accident Occurring at Windsor on the 26th Day of September, 1948, in the Operation of the Plant or Equipment of The Connecticut Company, Resulting in the Death of Samuel H. Richardson

Title as recorded

REPORT OF THE ENGINEERING DIVISION OF THE EXAMINATION INTO THE CAUSES OF AND CIRCUMSTANCES CONNECTED WITH THE ACCIDENT OCCURRING AT WINDSOR ON THE 26TH DAY OF SEPTEMBER, 1948, IN THE OPERATION OF THE PLANT OR EQUIPMENT OF THE CONNECTICUT COMPANY, RESULTING IN THE DEATH OF SAMUEL H. RICHARDSON

Status
Closed November 23, 2005
Filings
None listed
Documents
On the current system (documents are copied for 2024 and later dockets)

This docket's record on the current system (opens in a new tab)

Filings

This historical docket holds a single summary record from the pre-electronic archive. There are no separate filings.