Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

company does not operate facilities in public rights of way, therefore not required to file emergency plan

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 09/04/2001 [01-05-22] () - company does not operate facilities in public rights of way, therefore not required to file emergency plan

This filing on the current system (opens in a new tab)