Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Additional information regarding deferred start-up costs and allocation loading factor

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 01/26/2004 [02-02-18] (Berchem, Moses & Devlin, P.C.) - Additional information regarding deferred start-up costs and allocation loading factor

This filing on the current system (opens in a new tab)