Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

CL&P and UI Guidelines for Generator Interconnection

Correspondence

Filed by Northeast Utilities

Part of

DPUC Investigation into the Need For Interconnection Standards for Distributed Generation

Type of filing
Correspondence
Date filed
December 22, 2003
Filed by
Northeast Utilities
Files
Not listed yet

As listed on the current system

Corres. 12/22/2003 [03-01-15] (Northeast Utilities) - CL&P and UI Guidelines for Generator Interconnection

This filing on the current system (opens in a new tab)