DPUC letter to Precision Engineering stating Dunham has completed Phase 1A, 1B and II of Certificate process.
Filed by DPUC
Part of
Application of Engineering & Architecture, P.C. for a Certificate of Public Convenience and Necessity for Dunham Pond Condominiums, New Fairfield, CT
- Type of filing
- Correspondence
- Date filed
- September 21, 2004
- Filed by
- DPUC
- Files
- Not listed yet
As listed on the current system
Corres. 09/21/2004 [03-06-12] (DPUC) - DPUC letter to Precision Engineering stating Dunham has completed Phase 1A, 1B and II of Certificate process.
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)