Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 053

Request for extension of time until 1/9/04 to respond to data requests

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 053 01/05/2004 (Nextel of the Mid-Atlantic)Granted - Request for extension of time until 1/9/04 to respond to data requests [03-09-01PH01]

This filing on the current system (opens in a new tab)