Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Letter to All Certified Electric Suppliers directing them to submit, no later than 12/3/04, the number of dislocated workers on the roster that have been hired by their company in the preceding 12 months.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 10/15/2004 [04-01-06] (DPUC) - Letter to All Certified Electric Suppliers directing them to submit, no later than 12/3/04, the number of dislocated workers on the roster that have been hired by their company in the preceding 12 months.

This filing on the current system (opens in a new tab)