Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

To Putts Bridge, questions 4 thru 5

Interrogatories

Filed by EL

Part of

Application of Consolidated Edison Energy-Massachusetts Inc. for Qualification of Putts Bridge as a Class II Renewable Energy Source

Type of filing
Interrogatory (Interrogatories)
Date filed
September 20, 2005
Filed by
EL
Files
Not listed yet

As listed on the current system

Interrogs from EL to Putts Bridge 4 thru 5-Issued 09/20/2005 [04-01-22]

This filing on the current system (opens in a new tab)