Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

comments

Written Comments

Filed by Enel North America, Inc.

Part of

DPUC Declaratory Ruling Concerning “Run-of-the-River Hydropower” as That Term is Used in the Definitions of Class I and Class II Renewable Energy Source in C.G.S. §16-1(26) & (27)

Type of filing
Comments (Written Comments)
Date filed
March 26, 2004
Filed by
Enel North America, Inc.
Files
Not listed yet

As listed on the current system

Written Comments 03/26/2004 [04-02-07] (Enel North America, Inc.) - comments

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)