Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Fourth quarter 2025 production report for the Saywatt Hydroelectric, LLC hydro-electric dam

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 05/09/2026 [04-05-22RE02] Order No.1 / William P. Short Iii / Fourth quarter 2025 production report for the Saywatt Hydroelectric, LLC hydro-electric dam

This filing on the current system (opens in a new tab)