Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. One

Third quarter 2025 production report for the M.S.C. Hydroelectric (f/k/a Toutant) hydro-electric dam

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 02/01/2026 [04-05-28RE01] Order No.One / William P. Short Iii / Third quarter 2025 production report for the M.S.C. Hydroelectric (f/k/a Toutant) hydro-electric dam

This filing on the current system (opens in a new tab)