A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
CorrespondenceFiled by Lenard Engineering, Inc.

Copy of letter to J.Okrongly DPH re: Rev. Water Supply Plan, Berlin

Part of

Docket 04-06-13Closed

DPUC Review of Berlin Water Control Commission Water Supply Plan

Type of filing
Correspondence
Date filed
December 27, 2005
Filed by
Lenard Engineering, Inc.
Files
Not listed yet
As listed on the current system: Corres. 12/27/2005 [04-06-13] (Lenard Engineering, Inc. ) - Copy of letter to J.Okrongly DPH re: Rev. Water Supply Plan, Berlin

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)