Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

In receipt of phase 1A application, however, the review cannot move forward without a decision from the water utility coordinating committee (WUCC) for the Durham area.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 07/28/2005 [04-10-26] (DPH) - In receipt of phase 1A application, however, the review cannot move forward without a decision from the water utility coordinating committee (WUCC) for the Durham area.

This filing on the current system (opens in a new tab)