Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

RE Water Supply System, Halter Estates, Bethany, Phase 1 A

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 02/14/2005 [04-11-10] (Regional Water Authority) - RE Water Supply System, Halter Estates, Bethany, Phase 1 A

This filing on the current system (opens in a new tab)