Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Phase 1-B is approved for Quarry Ridge Condo.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 02/02/2007 [05-07-06] () - Phase 1-B is approved for Quarry Ridge Condo.

This filing on the current system (opens in a new tab)