Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

14 Constituents objecting to NRG Contract to build a new power plant in Montville

CorrespondenceFiled by Deveran, Martin, Corlombe, Gray, Mongillo, Campos, Chalk, Baker, Austin, Rodriquez, KlinefelterNo files listed
Part of docket 05-07-14PH02Closed
  • Electric
DPUC Investigation of Measures to Reduce Federally Mandated Congestion Charges (Long Term Measures)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 02/08/2007 [05-07-14PH02] (Deveran, Martin, Corlombe, Gray, Mongillo, Campos, Chalk, Baker, Austin, Rodriquez, Klinefelter ) - 14 Constituents objecting to NRG Contract to build a new power plant in Montville

This filing on the current system (opens in a new tab)