Qualifications for Proposal – 2: Two combustion turbines and upgrade to Shepaug hydro turbine
Filed by NE Energy Inc.No files listed
Part of docket 05-07-14PH02Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Corres. 11/13/2006 [05-07-14PH02] (NE Energy Inc.) - Qualifications for Proposal--2: Two combustion turbines and upgrade to Shepaug hydro turbine