Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Written Comments

DPUC has failed to render preliminary findings required by Connecticut General Statutes Section 16-8a(c).

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Written Comments 08/28/2006 [06-02-03PH01] (Connecticut Coalition Against Millstone) - DPUC has failed to render preliminary findings required by Connecticut General Statutes Section 16-8a(c).

This filing on the current system (opens in a new tab)