Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 037

CNG and SCG Request PURA's Response by October 9, 2015 for the Approval of their Shifted Cost Calculations. The Shifted Cost Rates are to be effective with each Company's November 2015 Billing Cycle.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 037 09/21/2015 (CNG-SCG) - CNG and SCG Request PURA's Response by October 9, 2015 for the Approval of their Shifted Cost Calculations. The Shifted Cost Rates are to be effective with each Company's November 2015 Billing Cycle. [06-04-04]

This filing on the current system (opens in a new tab)