Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

DPUC letter to UI authorizing UI to spend up to an additional $1 million to be spent on 2007 C&LM program costs to be funded from the 2008 C&LM budget.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 12/03/2007 [06-10-02] (DPUC) - DPUC letter to UI authorizing UI to spend up to an additional $1 million to be spent on 2007 C&LM program costs to be funded from the 2008 C&LM budget.

This filing on the current system (opens in a new tab)