Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

DPUC letter to Liberty Power Delaware finding the Company has fulfilled the requirements of the DPUC letter dated 9/24/09.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 12/08/2009 [06-12-06] (DPUC) - DPUC letter to Liberty Power Delaware finding the Company has fulfilled the requirements of the DPUC letter dated 9/24/09.

This filing on the current system (opens in a new tab)