Public and confidential versions of 1) London Economics International LLC’s (LEI), report entitled “Recommendations on Selection of Projects in the 2006 Connecticut RFP Process” dated July 5, 2007, 2) Inland Energy Consulting, Inc.’s (Inland) report entitled “Summary Report and Results of Analysis, Electric Generation Project Execution Risk” dated April 23, 2007, and 3) Siemens Power Transmission & Distribution, Inc., Power Transmission International’s (PTI Siemens) report entitled “Summary of the Transmission Assessment for the Winning Connecticut FCM Portfolio” dated May 2, 2007. Inland’s PTI Siemens’ reports are the same as the ones attached to the Department’s May 3, 2007 Decision in Docket No. 05-07-14PH02, DPUC Investigation of Measures To Reduce Federally Mandated Congestion Charges (Long-Term Measures).
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Corres. 07/06/2007 [07-04-24] (DPUC/LEI) - Public and confidential versions of 1) London Economics International LLC’s (LEI), report entitled “Recommendations on Selection of Projects in the 2006 Connecticut RFP Process” dated July 5, 2007, 2) Inland Energy Consulting, Inc.’s (Inland) report entitled “Summary Report and Results of Analysis, Electric Generation Project Execution Risk” dated April 23, 2007, and 3) Siemens Power Transmission & Distribution, Inc., Power Transmission International’s (PTI Siemens) report entitled “Summary of the Transmission Assessment for the Winning Connecticut FCM Portfolio” dated May 2, 2007. Inland’s PTI Siemens’ reports are the same as the ones attached to the Department’s May 3, 2007 Decision in Docket No. 05-07-14PH02, DPUC Investigation of Measures To Reduce Federally Mandated Congestion Charges (Long-Term Measures).