Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Via Electronic Filer SubmissionAugust 1, 2014Nicholas E. NeeleyActing Executive SecretaryCT Public Utilities Regulatory AuthorityTen Franklin SquareNew Britain, CT 06051RE: DPUC Review of Long-term Renewable Energy Contracts – Round 2 Results, Docket No. 07-04-27, Petition of Plainfield Renewables Energy, LLC for Termination or Amendment of Sustainable Biomass Fuel Limitations Dear Mr. Neely: The Northeast Office of the National Waste & Recycling Association (NW&RA) and the Construction Demolition Recycling Association (CDRA) welcome this opportunity to comment on the Plainfield Renewable Energy (PRE) Petition for Termination or Amendment of Sustainable Biomass Fuel Limitations (Round 2 Results, Docket No. 07-04-27). The PRE petition directly impacts NW&RA and CDRA members by substantially redefining the markets in which they operate. As a result, NW&RA and CDRA members have a substantial interest in the action of the CT Public Utility Regulatory Authority (PURA) in this regard. NW&RA is a not-for-profit trade association with member companies in all fifty states, including active policy-making chapters in Connecticut (CT), Massachusetts (MA), and New York (NY). NW&RA represents companies throughout the entire northeast region that collect, process, transfer, recycle and dispose of all segments of the regional waste stream. The mission of NW&RA is to promote the management of recyclables, and other recoverable and waste materials, in a manner that is environmentally responsible, efficient, profitable and ethical, while benefiting the public and protecting employees.CDRA is a not-for-profit trade association with members across North America, and with a New England Chapter that includes Connecticut. Its members generate, haul, process and market construction and demolition materials. The CDRA promotes and defends the environmentally sound recycling of the more than 325 million tons of recoverable construction and demolition (C&D) materials that are generated in the United States annually.Collectively NW&RA and CDRA members service daily the thousands upon thousands of the generators that produce the C&D supply of wood fuels; and, they receive materials daily from hundreds upon hundreds of haulers that service those generators. In this daily cycle thousands of individuals are gainfully employed and more than a 100 northeast facilities operate to see that the C&D materials produced by the citizens, communities and businesses of the region are managed properly. Association members are part of America’s estimated $65 billion annual taxpaying recycling and waste services industry, with a payroll in the $10s of millions and a host of other positive economic driver factors. PRE’s request for termination or amendment of sustainable biomass fuel limitations should be denied in whole at this time by PURA. The associations believe any change to the original PRE fuel limitations arrangement will be severely disruptive to the marketplace and will result in untold economic harms for CT citizens, communities and businesses, as well as the citizens, communities and businesses in the greater northeast region. The PRE petition does not present sufficient factual information to justify PURA granting the requested relief. NW&RA and CDRA do not agree with PRE’s claim about the availability and quality of C&D wood fuel supplies available for its use from both CT and other northeast region suppliers. PRE provides no evidence to support its assertion that sufficient quantities of quality C&D wood fuel supplies are unavailable for the facility. PRE also has not provided any evidence to support its assertion that it cannot operate the facility profitably within the existing fuel conditions.PRE’s current fuel requirements were the result of carefully contemplated and thorough reviews of the competitive market for biomass power and the existing CT and regional C&D wood and biomass wood fuel supplies. Accordingly, PURA should require PRE to submit similar economic analyses and reviews with substantive, credible information before it acts on the PRE petition; or, in the alternative conduct such reviews itself. NW&RA and CDRA believe the review of this information is essential before PURA makes any decision undoing or changing PRE’s current fuel conditions, since doing so will have a direct and immediate impact on both biomass wood supply and pricing in CT and the region. Further, NW&RA and CDRA believe this information is necessary for PURA in its analysis and review since PRE is the sole energy facility that qualifies for producing CT Class I RECs using eligible C&D biomass under CT Public Act 13-303. This information should be reviewed and accounted for so that the ramifications of any change are known before PURA takes any action on the PRE petition. Changing current PRE wood fuel requirements will directly impact both the management and recovery of C&D wood in CT and the entire region. If the PRE market for C&D wood and other biomass wood fuel supplies is altered it will impair the attainment of CT’s revised solid waste management and energy goals and related goals in other states in the region. NW&RA and CDRA understand that procedurally, based on past practice, PURA does not deny a petition to modify fuel restrictions unless it determines the regulated company is able to operate the facility and earn a reasonable return without the modification. The PRE filing does not demonstrate that profitable operation is contingent on the fuel supply modification. Before acting on the PRE petition, PURA should conduct a review to determine: (1) whether PRE is failing to earn reasonable returns today; and (2) whether or not any such failure is likely to continue; and, (3) whether any such failure is related to start-up challenges that follow the commissioning of some power plants; and, (4) whether any such failure is related to sub-optimal operating and management procedures being used.And last, NW&RA and CDRA also request, if appropriate, within all existing rules, regulations and protocols that PURA convene stakeholder meetings to solicit further input on the currently pending PRE petition. NW&RA and CDRA would welcome the opportunity to be part of any such stakeholder meetings.For the associations, Sincerely,Steven G. Changaris pdf signed Northeast Regional Manager Steven Changaris, Manager, Northeast Region 482 Southbridge Street, Suite 373

CorrespondenceFiled by National Waste & Recycling AssociationNo files listed
Part of docket 07-04-27Closed
  • Electric
  • Renewables
DPUC Review of Long-Term Renewable Energy Contracts – Round 2 Results

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 08/01/2014 [07-04-27] (National Waste & Recycling Association) - Via Electronic Filer SubmissionAugust 1, 2014Nicholas E. NeeleyActing Executive SecretaryCT Public Utilities Regulatory AuthorityTen Franklin SquareNew Britain, CT 06051RE: DPUC Review of Long-term Renewable Energy Contracts – Round 2 Results, Docket No. 07-04-27, Petition of Plainfield Renewables Energy, LLC for Termination or Amendment of Sustainable Biomass Fuel Limitations Dear Mr. Neely: The Northeast Office of the National Waste & Recycling Association (NW&RA) and the Construction Demolition Recycling Association (CDRA) welcome this opportunity to comment on the Plainfield Renewable Energy (PRE) Petition for Termination or Amendment of Sustainable Biomass Fuel Limitations (Round 2 Results, Docket No. 07-04-27). The PRE petition directly impacts NW&RA and CDRA members by substantially redefining the markets in which they operate. As a result, NW&RA and CDRA members have a substantial interest in the action of the CT Public Utility Regulatory Authority (PURA) in this regard. NW&RA is a not-for-profit trade association with member companies in all fifty states, including active policy-making chapters in Connecticut (CT), Massachusetts (MA), and New York (NY). NW&RA represents companies throughout the entire northeast region that collect, process, transfer, recycle and dispose of all segments of the regional waste stream. The mission of NW&RA is to promote the management of recyclables, and other recoverable and waste materials, in a manner that is environmentally responsible, efficient, profitable and ethical, while benefiting the public and protecting employees.CDRA is a not-for-profit trade association with members across North America, and with a New England Chapter that includes Connecticut. Its members generate, haul, process and market construction and demolition materials. The CDRA promotes and defends the environmentally sound recycling of the more than 325 million tons of recoverable construction and demolition (C&D) materials that are generated in the United States annually.Collectively NW&RA and CDRA members service daily the thousands upon thousands of the generators that produce the C&D supply of wood fuels; and, they receive materials daily from hundreds upon hundreds of haulers that service those generators. In this daily cycle thousands of individuals are gainfully employed and more than a 100 northeast facilities operate to see that the C&D materials produced by the citizens, communities and businesses of the region are managed properly. Association members are part of America’s estimated $65 billion annual taxpaying recycling and waste services industry, with a payroll in the $10s of millions and a host of other positive economic driver factors. PRE’s request for termination or amendment of sustainable biomass fuel limitations should be denied in whole at this time by PURA. The associations believe any change to the original PRE fuel limitations arrangement will be severely disruptive to the marketplace and will result in untold economic harms for CT citizens, communities and businesses, as well as the citizens, communities and businesses in the greater northeast region. The PRE petition does not present sufficient factual information to justify PURA granting the requested relief. NW&RA and CDRA do not agree with PRE’s claim about the availability and quality of C&D wood fuel supplies available for its use from both CT and other northeast region suppliers. PRE provides no evidence to support its assertion that sufficient quantities of quality C&D wood fuel supplies are unavailable for the facility. PRE also has not provided any evidence to support its assertion that it cannot operate the facility profitably within the existing fuel conditions.PRE’s current fuel requirements were the result of carefully contemplated and thorough reviews of the competitive market for biomass power and the existing CT and regional C&D wood and biomass wood fuel supplies. Accordingly, PURA should require PRE to submit similar economic analyses and reviews with substantive, credible information before it acts on the PRE petition; or, in the alternative conduct such reviews itself. NW&RA and CDRA believe the review of this information is essential before PURA makes any decision undoing or changing PRE’s current fuel conditions, since doing so will have a direct and immediate impact on both biomass wood supply and pricing in CT and the region. Further, NW&RA and CDRA believe this information is necessary for PURA in its analysis and review since PRE is the sole energy facility that qualifies for producing CT Class I RECs using eligible C&D biomass under CT Public Act 13-303. This information should be reviewed and accounted for so that the ramifications of any change are known before PURA takes any action on the PRE petition. Changing current PRE wood fuel requirements will directly impact both the management and recovery of C&D wood in CT and the entire region. If the PRE market for C&D wood and other biomass wood fuel supplies is altered it will impair the attainment of CT’s revised solid waste management and energy goals and related goals in other states in the region. NW&RA and CDRA understand that procedurally, based on past practice, PURA does not deny a petition to modify fuel restrictions unless it determines the regulated company is able to operate the facility and earn a reasonable return without the modification. The PRE filing does not demonstrate that profitable operation is contingent on the fuel supply modification. Before acting on the PRE petition, PURA should conduct a review to determine: (1) whether PRE is failing to earn reasonable returns today; and (2) whether or not any such failure is likely to continue; and, (3) whether any such failure is related to start-up challenges that follow the commissioning of some power plants; and, (4) whether any such failure is related to sub-optimal operating and management procedures being used.And last, NW&RA and CDRA also request, if appropriate, within all existing rules, regulations and protocols that PURA convene stakeholder meetings to solicit further input on the currently pending PRE petition. NW&RA and CDRA would welcome the opportunity to be part of any such stakeholder meetings.For the associations, Sincerely,Steven G. Changaris pdf signed Northeast Regional Manager Steven Changaris, Manager, Northeast Region 482 Southbridge Street, Suite 373 | Auburn, MA 01501 Office [phone removed] | Fax [phone removed] [email removed] | | | | website | newsletter&SincerelypdfsignedWilliam M. Turley President http://www.cdrecycling.org

This filing on the current system (opens in a new tab)