not to approve any long-term rate payer contract under project 100 for the Plainfield Renewable Energy, LLC (PRE) proposed power plant
Filed by Environment and Human Health, Inc.No files listed
Part of docket 07-04-27Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Corres. 10/25/2007 [07-04-27] (Environment and Human Health, Inc.) - not to approve any long-term rate payer contract under project 100 for the Plainfield Renewable Energy, LLC (PRE) proposed power plant