Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

UI and CL&P rate changes starting 12/13/2013.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 12/10/2013 [07-05-33] (Clearview Electric Inc) - UI and CL&P rate changes starting 12/13/2013.

This filing on the current system (opens in a new tab)