Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

CL&P withdraws its request to recover the cost of executive incentive compensation in this rate case.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 11/09/2007 [07-07-01] (Northeast Utilities) - CL&P withdraws its request to recover the cost of executive incentive compensation in this rate case.

This filing on the current system (opens in a new tab)