Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Draft Decision

Draft decision

Filed

Part of

Declaratory Ruling Regarding the Bridgewater Power Company Application for Qualification as a Class I Renewable Generator Facility

Type of filing
Draft decision (Draft Decision)
Date filed
November 5, 2025
Filed by
Not recorded
Files
Not listed yet

As listed on the current system

Draft Decision, 11/05/2025 [07-09-02]

This filing on the current system (opens in a new tab)