A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Draft decisionFiled

Draft Decision

Part of

Docket 07-12-36Closed

Petition of EMCOR Energy Services, Inc. for a Declaratory Ruling That The Stamford Hospital Fuel Cell Project Will Qualify as a Class I Renewable Energy Source

Type of filing
Draft decision (Draft Decision)
Date filed
January 18, 2008
Filed by
Not recorded
Files
Not listed yet
As listed on the current system: Draft Decision, 01/18/2008 [07-12-36]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)