Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

In accordance with Section 2.5(a) of the Peaking Generation Cost of Service Contract for Differences between PSEG and CL&P

Compliance filingFiled by PSEG Services Corp.No files listed
Part of docket 08-01-01Closed again
  • Electric
DPUC Review of Peaking Generation Projects

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 09/04/2009 [08-01-01] Order No. / PSEG Services Corp. / In accordance with Section 2.5(a) of the Peaking Generation Cost of Service Contract for Differences between PSEG and CL&P

This filing on the current system (opens in a new tab)