Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Letter to GenConn Energy LLC confirming that no further approvals required in connection with the financing of the Devon and Middletown peaking generation projects

CorrespondenceFiled by DPUCNo files listed
Part of docket 08-01-01Closed again
  • Electric
DPUC Review of Peaking Generation Projects

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 04/16/2009 [08-01-01] (DPUC) - Letter to GenConn Energy LLC confirming that no further approvals required in connection with the financing of the Devon and Middletown peaking generation projects

This filing on the current system (opens in a new tab)