Interrogatories
To GenConn,Bridgeport Energy II,PSEG,Maxim Energy,Bridgeport Peaking Power,First Light Power Enterprises, questions 1 thru 10
Filed by CL&PNo files listed
Part of docket 08-01-01Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Interrogs from CL&P to GenConn,Bridgeport Energy II,PSEG,Maxim Energy,Bridgeport Peaking Power,First Light Power Enterprises 1 thru 10-Issued 04/17/2008 [08-01-01]