Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 2

Compliance filingFiled by Northeast UtilitiesNo files listed
Part of docket 08-03-03Closed
  • Electric
  • Renewables
DPUC Review of Long-Term Renewable Contracts – Round 3 Results

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 07/10/2009 [08-03-03] Order No.2 - Executed EPA with Bridgeport Fuel Cell Park / Northeast Utilities /

This filing on the current system (opens in a new tab)