Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Late-filed exhibits

Exhibits 9 thru 11

Late-filed exhibitFiled by Pullman & ComleyNo files listed
Part of docket 08-03-03Closed
  • Electric
  • Renewables
DPUC Review of Long-Term Renewable Contracts – Round 3 Results

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

LFEs Filed (Pullman & Comley) 9 thru 11 Date Filed: 12/05/2008

This filing on the current system (opens in a new tab)