Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Third well will be drilled prior to the completion

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 12/23/2008 [08-09-11] (Justice Resource Institute) - Third well will be drilled prior to the completion

This filing on the current system (opens in a new tab)