A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
CorrespondenceFiled by PURA

Letter to Dome Tech, Inc. finding that although the system did not meet the efficiency standards, its filing of July 27, 2011 fulfills the requirment for Order No. 1, Quarter No. 2

Part of

Docket 08-12-25Closed

Application of UTC power for Qualification of Windham Hospital as a Class III Renewable Energy Resource

Type of filing
Correspondence
Date filed
September 2, 2011
Filed by
PURA
Files
Not listed yet
As listed on the current system: Corres. 09/02/2011 [08-12-25] (PURA) - Letter to Dome Tech, Inc. finding that although the system did not meet the efficiency standards, its filing of July 27, 2011 fulfills the requirment for Order No. 1, Quarter No. 2

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)