Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Tunnel Hydro

Compliance Filing, Order No. COM05112

Filed by Firstlight Power

Part of

Application of Firstlight Hydro Generating Company for Qualification of Tunnel Units 1 & 2 as a Class I Renewable Energy Source

Type of filing
Compliance filing (Compliance Filing, Order No. COM05112)
Date filed
January 27, 2021
Filed by
Firstlight Power
Files
Not listed yet

As listed on the current system

Compliance Filings, 01/27/2021 [09-04-38] Order No.COM05112; DOC# 09-04-38 / Firstlight Power / Tunnel Hydro

This filing on the current system (opens in a new tab)