Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Answers to questions 1 thru 1

Interrogatory responses

Filed by Connecticut Water Company

Part of

Application of The Connecticut Water Company for a Water Infrastructure Conservation Adjustment Semi Annual Filing Report

Type of filing
Response (Interrogatory responses)
Date filed
May 17, 2019
Filed by
Connecticut Water Company
Files
Not listed yet

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Water Company) Date Filed: 05/17/2019

This filing on the current system (opens in a new tab)