Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

The Authority letter to the participants re: No service obligation is required.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 09/02/2011 [11-01-05] () - The Authority letter to the participants re: No service obligation is required.

This filing on the current system (opens in a new tab)