Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Letter requesting technical meeting - FILED IN ERROR SHOULD HAVE BEEN FILED AS MOTION NO. 5 REQUEST FOR TECHNICAL MEETING, REFILED AS MOTION ON 10/18/2013

CorrespondenceFiled by Murtha Cullina LlpNo files listed
Part of docket 11-01-10Closed
  • Electric
DPUC Review of ECB Agreement between UI and MEPT

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 10/16/2013 [11-01-10] (Murtha Cullina Llp) - Letter requesting technical meeting - FILED IN ERROR SHOULD HAVE BEEN FILED AS MOTION NO. 5 REQUEST FOR TECHNICAL MEETING, REFILED AS MOTION ON 10/18/2013

This filing on the current system (opens in a new tab)