Motion No. 035
Motion to confirm Q-EN-50 is not required and for an extension of time to respond to Q-EN-049.
Filed by CL&P dba Eversource Energy Joint with The United Illuminating Co, Frontier Communications and Verizon New York Inc.No files listed
Part of docket 11-03-07RE01Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Motion No. 035 04/11/2019 (CL&P dba Eversource Energy Joint with The United Illuminating Co, Frontier Communications and Verizon New York Inc.) - Motion to confirm Q-EN-50 is not required and for an extension of time to respond to Q-EN-049. [11-03-07RE01]