Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Metering and Verification Plan for Combined Heat and Power Plant

Correspondence

Filed by Element Markets

Part of

Application of Danbury Hospital for Qualification of Danbury Hospital CHP Independence Project as a Class III Renewable Energy Source

Type of filing
Correspondence
Date filed
June 6, 2012
Filed by
Element Markets
Files
Not listed yet

As listed on the current system

Corres. 06/06/2012 [12-04-11] (Element Markets) - Metering and Verification Plan for Combined Heat and Power Plant

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)