Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Approval Process for Full Requirements and PM

CorrespondenceFiled by Northeast UtilitiesNo files listed
Part of docket 12-06-02Closed
  • Electric
Request for PURA Review of Power Procurement Plan

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 10/15/2012 [12-06-02] (Northeast Utilities) - Approval Process for Full Requirements and PM

This filing on the current system (opens in a new tab)